Design, fabrication and integration of Waterjet Testing unit |
03/08/23 |
15/07/23 |
15/07/23 |
Design, Fabrication, Erection and Commissioning of LFR Thermal Receiver System and Integration with Biomass Boiler, Steam Turbine cum Generator, Desalination Unit, Space Cooling and Cooking |
29/03/19 |
08/03/19 |
08/03/19 |
Design, Manufacturing, Validation and supply of sprays Test Rig |
28/05/21 |
29/04/21 |
29/04/21 |
DESIGN, SUPPLY AND DREDGING |
28/01/19 |
29/11/18 |
29/11/18 |
Design, Supply and Installation of Tensile Structure roofing for terrace portion at Dean Student Office Building in IIT Madras |
04/08/20 |
05/08/20 |
17/07/20 |
Design, Supply and Installation of Tensile Structure roofing for terrace portion(2nd Floor Level) at Campus Café in IIT Madras |
27/02/20 |
07/02/20 |
18/02/20 |
Design, supply, installation & commissioning of lab furniture |
02/12/20 |
12/11/20 |
12/11/20 |
DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF A CLEANROOM |
05/02/24 |
22/01/24 |
22/01/24 |
DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF LAB AND OFFICE FURNITURE FOR THE BIOTECHNOLOGY DEPARTMENT |
22/01/18 |
22/12/17 |
22/12/17 |
Design, Supply, Installation, Testing and Commissioning of 8.8 kWp Rooftop Grid Interactive Solar Power plants in G8 Building Stilt plus 8 Floors at IIT Madras |
27/02/24 |
15/02/24 |
15/02/24 |