DYNAMIC MECHANICAL ANALYZER WITH INTEGRATED HEATING ASSEMPLY |
27/12/23 |
07/12/23 |
07/12/23 |
DYNAMIC MECHANICAL ANALYZER WITH INTEGRATED HEATING ASSEMPLY |
27/12/23 |
07/12/23 |
07/12/23 |
Provision of inline fan for Gents toilet at Biotech-1 block in IIT Madras |
04/12/23 |
28/11/23 |
28/11/23 |
Fiber Bragg Grating based Optic Sensors, Interrogators and Data Acquisition System for Long Term Monitoring of a Pre-Stressed Concrete Box Girder Bridge |
28/12/23 |
24/11/23 |
24/11/23 |
SUPPLY OF WAVE HEIGHT MEASURING AMPLIFIER, WAVE GAUGE & CABLE AND STANDARD CABINET WITH POWER SUPPLY MODULE |
13/12/23 |
13/12/23 |
22/11/23 |
Clean Room in CSD221 |
11/12/23 |
15/11/23 |
15/11/23 |
PCBs Manufacturing and Assembly |
11/12/23 |
14/11/23 |
14/11/23 |
Replacement of worn-out valve flexible bellows strainer and pipes of condenser pumps of 3 x 140 TR chiller plant at Biotechnology -II building |
16/11/23 |
10/11/23 |
10/11/23 |
75TR WATER CHILLER WATER COOLED |
15/11/23 |
09/11/23 |
09/11/23 |
Battery Pack Charging and Discharging Tester |
22/11/23 |
09/11/23 |
09/11/23 |