MILLIMETER WAVE IMAGING SYSTEM |
01/11/23 |
12/10/23 |
12/10/23 |
Immersion Cooler with Flexible Cooling Coil and Reaction Bath |
31/10/23 |
11/10/23 |
11/10/23 |
High-Performance Lithium Ion Battery Pack for Hyperloop Pod Prototype |
07/11/23 |
09/10/23 |
09/10/23 |
d33 Tester |
26/10/23 |
06/10/23 |
06/10/23 |
HEATING MODULE WITH EMBEDDED AND VIRTUALLY FREE RADIATING HEATING ELEMENT |
25/10/23 |
03/10/23 |
03/10/23 |
Procurement of Track Suits |
07/10/23 |
09/10/23 |
27/09/23 |
Battery cell charging discharging unit |
03/10/23 |
27/09/23 |
27/09/23 |
Turbomolecular pump with controller and accessories |
16/10/23 |
26/09/23 |
26/09/23 |
3D Solid State LiDAR |
16/10/23 |
25/09/23 |
25/09/23 |
SUPPLY, INSTALLATION AND COMMISSIONING OF VACUUM PUMPS FOR the 400m VACUUM TUBE |
02/10/23 |
25/09/23 |
25/09/23 |