T No 03/2014-15/Civil/ Dismantling the damaged compound wall and constructing new compound wall at northern side to reduce the barricaded area inside the swimming pool compound.

Dismantling the damaged compound wall and constructing new compound wall at northern side to reduce the barricaded area inside the swimming pool compound.

Reference: 
Repairing of the Compound wall at Northern side of Swimming pool
Opening Date: 
25/04/14
Closing Date: 
08/05/14
Address: 
The Executive Engineer (Civil) Engineering Unit, Administrative Building, 3rd floor, Indian Institute of Technology Madras Chennai – 600036.
Administrative Unit: